PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Finished setting up the Shear Wall panels at Elev. 4-Stair -2 2nd floor Facing South (800x600).jpg Setting the footing forms at Elev. 7-Stair -4,5 Facing North (800x600).jpg Cleaning around Foundation Walls at Elev. 1,2,3 Facing South-East (800x600).jpg Finished stripping the Foundation wall forms at Monumental Stairs Facing South (800x600).jpg Finished stripping the Foundation wall forms at Monumental Stairs Facing West (800x600).jpg Started unbolting the Shear Wall Panels at Elev. 5-6 2nd Floor Facing South(800x600).jpg Waterproofing around foundation walls at Elev. 5-6 Facing South-West (800x600).jpg Setting the footing forms at Elev. 7-Stair -4,5 Facing North-West (800x600).jpg
Previous pageNext page Finished stripping the Foundation wall forms at Monumental Stairs Facing South (800x600)
Finished stripping the Foundation wall forms at Monumental Stairs Facing South (800x600)